ISO 29001:2020 Document Kit
Our ISO 29001:2020 Document Kit is structured to meet the core requirements of the petroleum, petrochemical, and natural gas sector. It provides all the essential manuals, procedures, SOPs, and forms needed for certification. This ready-to-use package includes 113 essential documents, structured into four levels.
The document kits comprise general templates. If your organization requires further customization based on your business processes, activities, scope, and context, you may Request for Quotation by contacting us at hello@kls-academy.com.
The document kit is structured into four levels for clarity, ease of implementation, and compliance assurance:
4 Levels of Documentation Structure
Level 1: Manual (6 Files)
- Quality Manual
- Quality Policy
- Quality Objectives
- Internal and External Issues Register
- Needs and Expectations of Interested Parties Register
- Roles & Responsibilities of QMS Steering Committee
Level 2: Mandatory Procedures (12 Files)
- Risk Assessment Procedure
- Competence & Training Procedure
- Document & Data Control Procedure
- Contract Review & Complaints Handling Procedure
- Design & Development Procedure
- Purchasing of Products & Services Procedure
- External Provider Evaluation & Selection Procedure
- Nonconforming Output Control Procedure
- Customer Feedback & Improvement Procedure
- Internal Audit Procedure
- Management Review Procedure
- Corrective Actions Procedure
Level 2: Standard Operating Procedures (SOP) (28 Files)
- SOP for Production
- SOP for Manufacturing of Bitumen Emulsion
- SOP for Manufacturing of Blown Bitumen
- SOP for Manufacturing of Fuel
- SOP for Refining of Waste Oil
- SOP for Solid Waste Handling, Storage and Disposal
- SOP for Centrifuge Operation
- SOP for Tanker Loading and Unloading
- SOP for Diesel Generating Set Operation
- SOP for Air Compressor Operation
- SOP for Thermic Fluid Heater Operation
- SOP for Sample Receipt
- SOP for Testing of Purity of Hydrochloric Acid
- SOP for Testing of Evaporation
- SOP for Cone Penetration Meter Operation
- SOP for Ring and Ball Apparatus Operation
- SOP for Ductility Apparatus Operation
- SOP for Viscosity Bath Operation
- SOP for Flash Point Operation
- SOP for Oven / Muffle Furnace Operation
- SOP for Weighing Balance Operation
- SOP for Testing of Residue by Sieving through 600 Micron Sieve
- SOP for Determination of Emulsion at Low Temperature
- SOP for Determination of Storage Stability
- SOP for Testing of Coating Ability and Water Resistance
- SOP for Testing of Stability to Mixing with Cement
- SOP for Determination of Particle Charge
- SOP for Testing of Viscosity
Level 3: Work Instructions (6 Files)
- Dispatch Process
- Engineering Process
- Production Process
- Quality Control Process
- Quality Management System (QMS) Process
- Stores Process
Level 4: Forms and Checklists (61 Files)
- Offer for Products Quotation
- Order Form & Order Confirmation
- Customer Feedback Form
- Complaint Report
- Design & Development Plan
- Design Review Report
- Design Verification Report
- Design Validation Report
- Design Change Note
- Incoming Inspection Report
- In-Process Inspection Report
- Final Inspection Report / Certificate of Analysis
- Masterlist & Distribution List of Documents
- Document Change Request Note
- Periodic Document Review Report
- Masterlist of Records
- Quality Objectives Monitoring Report
- Production Plan
- Daily Production Report
- Product Log Sheet
- Blending Report
- Nonconforming Output & Action Report
- Corrective Action Report
- Clausewise Documentwise Audit Review Report
- Audit Plan / Schedule
- Internal Audit Non-Conformity Report
- Circular (Management Review Meeting Agenda)
- Minutes of Meeting
- Management of Change Form
- Risk Assessment & Opportunity Sheet
- Calibration Status of Equipment
- Equipment History Card
- Preventive Maintenance Schedule
- Equipment-wise Preventive Maintenance Checkpoints
- List of Critical Spares
- Skill Matrix
- Employee Competence Report
- Training Calendar
- Training Report
- Induction Training Report
- Interview Report
- Job Description
- Goods Receipt Note
- Purchase Order
- Indent (Purchase Requisition)
- Material Issue Slip
- Stock Register
- Approved External Provider List
- External Provider Evaluation & Registration Report
- External Provider Re-Evaluation Report
- Preservation Assessment Report
- Finished Product Delivery Challan
- Sales Invoice
- Gate Pass (Delivery Challan / Memo for Sending Material Outside Factory)
- Log Sheet – Bitumen Emulsion
- Log Sheet – Furnace Oil (Recycled / Fresh)
- Log Sheet – Blown Bitumen
- Log Sheet – Pyrolysis Process from Waste Plastic
- Log Sheet – DG Set
- Log Sheet – Thermic Fluid Heater
- Preservation & Delivery Note